Statement Showing Details of Loans/Credits Received Upto March 31,1999 (Govt. Loans)
COUNTRY/INSTITUTION : Japan
CURRENCY : Millions Japanese Yen

      Value of Opening     Closing     Closing Debt Payment of
      Agreement Pipeling Utilisation Pipeline Principal Repaid Outstanding Interest/CC
Sl.   Debt signed less As on During Upto As on During Upto As on During Upto
No. Loan Description Number Deobligation 01/04/1998 1998-99 31/03/1999 31/03/1999 1998-99 31/03/1999 31/03/1999 1998-99 31/03/1999
Second Five Year Plan (1956-61)-PROJECT
1 1st Yen Credit DT 04/02/1958 47 16608 0 0 16608 0 123 16079 529 16 11347
  TOTAL :   16608 0 0 16608 0 123 16079 529 16 11347
Third Five Year Plan (1961-66)-PROJECT
2 2nd Yen Credit DT 18/08/1961 99 34111 0 0 34111 0 865 30051 4060 121 28754
3 3rd Yen Credit DT 24/10/1963 177 20686 0 0 20686 0 423 19028 1658 51 17539
4 4th Yen Credit DT 03/09/1964 211 18265 0 0 18265 0 327 17004 1261 39 13614
5 5th Yen Credit DT 25/06/1965 212 21046 0 0 21046 0 280 19998 1048 33 13869
  TOTAL :   94108 0 0 94108 0 1895 86081 8027 244 73776
Yearly Plan (1966-67)-NON-PROJECT
6 6th Yen Credit DT 16/12/1966 312 14958 0 0 14958 0 267 13762 1196 36 11245
  TOTAL :   14958 0 0 14958 0 267 13762 1196 36 11245
Yearly Plan (1967-68)-NON-PROJECT
7 7th Yen Credit DT 05/09/1967 348 13788 0 0 13788 0 205 12830 958 28 10496
8 Food Aid Credit DT 14/04/1967 361 2519 0 0 2519 0 49 2303 216 7 1955
  TOTAL :   16307 0 0 16307 0 254 15133 1174 35 12451
Yearly Plan (1968-69)-NON-PROJECT
9 8th Yen Credit DT 14/02/1969 405 10048 0 0 10048 0 114 9248 800 22 6718
  TOTAL :   10048 0 0 10048 0 114 9248 800 22 6718
Fourth Five Year Plan (1969-74)-PROJECT
10 11th Yen Credit DT 01/02/1972 543000 15509 0 0 15509 0 0 15509 0 0 8696
11 12th Yen Deep Sea Oil Project Addition DT 02/02/1973 571 2672 0 0 2672 0 0 2665 7 0 1633
12 Deep Oil Exploration Proj. DT 30/01/1974 605 268 0 0 268 0 0 268 0 0 166
13 Deep Sea Oil Exploration Project DT 11/05/1971 520 5168 0 0 5168 0 17 5050 118 4 3368
14 V.O.H. DT 28/07/1970 446 2412 0 0 2412 0 19 2269 143 4 1173
Fourth Five Year Plan (1969-74)-NON-PROJECT
15 10th Yen Credit DT 20/04/1971 519 8957 0 0 8957 0 0 8957 0 0 5442
16 11th Yen Credit DT 01/02/1972 54302 14879 0 0 14879 0 0 14879 0 0 8779
17 12th Yen Credit DT 02/02/1973 571 9929 0 0 9929 0 0 9929 0 2 6501
18 9th Yen Credit DT 03/03/1970 431 8991 0 0 8991 0 69 8473 518 14 5488
  TOTAL :   68785 0 0 68785 0 105 67999 786 24 41246
Fifth Five Year Plan (1974-78)-PROJECT
19 ADHOC Credit for B&P Fertilizer Proj. DT 12/09/1975 658 10897 0 0 10897 0 606 9994 903 54 6395
20 Bhatinda Fertilizer Proj. DT 02/08/1974 613 10987 0 0 10987 0 599 10987 0 18 6137
21 IDP-1 Tele.Co. DT 05/04/1977 703 8909 0 0 8909 0 435 5217 3692 141 4768
22 Panipat Fertilizer Proj. DT 10/04/1975 644 10996 0 0 10996 0 611 10388 608 43 6428
Fifth Five Year Plan (1974-78)-NON-PROJECT
23 13th Yen Credit DT 19/04/1974 618 6951 0 0 6951 0 320 6951 0 9 4171
24 14th Yen Credit DT 05/03/1978 642 6855 0 0 6855 0 390 6612 243 21 4102
25 IDC-1 Commodity Loan DT 31/03/1976 671 6928 0 0 6928 0 375 6180 748 36 3607
26 IDC-2 Commodity Loan DT 03/03/1977 690 10000 0 0 10000 0 488 6099 3901 149 6202
27 IDC-3 Commodity Loan DT 19/03/1977 712 19979 0 0 19979 0 975 11696 8283 316 11671
  TOTAL :   92502 0 0 92502 0 4799 74124 18378 787 53481
Yearly Plan (1978-79)-PROJECT
28 IDP-2 Nagarjuna Sagar Hydro Electric Project DT 13/06/1978 727 8098 0 0 8098 0 395 4345 3753 142 4615
29 IDP-3 Paithon Hydro Electric Project DT 10/08/1978 733 1147 0 0 1147 0 57 617 530 20 603
Yearly Plan (1978-79)-NON-PROJECT
30 IDC-4 Commodity Loan DT 06/10/1978 742 6000 0 0 6000 0 294 3077 2923 94 3000
  TOTAL :   15245 0 0 15245 0 746 8039 7206 256 8218
Yearly Plan (1979-80)-PROJECT
31 IDP-4 DT 04/03/1980 753 6200 0 0 6200 0 302 2870 3330 98 2818
  TOTAL :   6200 0 0 6200 0 302 2870 3330 98 2818
Sixth Five Year Plan (1980-85)-PROJECT
32 ID-P 14 Lower Mettur Hydroelectric Project DT 15/10/1981 825 7366 0 0 7366 0 359 2693 4673 136 2698
33 IDP-10 Thal Vaishet Fertilizer Project DT 24/09/1981 814 16535 0 0 16535 0 807 6453 10082 294 6359
34 IDP-11 III Telecom. Project DT 15/10/1981 822 4932 0 0 4932 0 241 1808 3124 91 2278
35 IDP-12 IV Telecom. Project DT 15/10/1981 823 9357 0 0 9357 0 456 3422 5935 173 3717
36 IDP-13 Nagarjuna Hydro Elect. Power DT 15/10/1981 824 6603 0 0 6603 0 322 2415 4188 122 2572
37 IDP-15 Lower Barbani Hydro Elect.Power DT 15/10/1981 826 1490 0 0 1490 0 71 562 928 27 272
38 IDP-16 Hirakud Hydro Project DT 15/10/1981 827 1500 0 0 1500 0 73 548 952 28 511
39 IDP-17 Railway Development Project DT 14/05/1982 839 2556 0 0 2556 0 125 875 1681 49 1035
40 IDP-18 Bombay Sub Railway Modernisation DT 14/05/1982 838 1748 0 0 1748 0 85 595 1153 33 479
41 IDP-19 V Telecom. Project DT 14/05/1982 840 5979 0 0 5979 0 292 2044 3935 114 2272
42 IDP-20 Anpara Thermal Power project DT 26/12/1984 888 24100 0 0 24100 0 1176 5291 18809 542 5725
43 IDP-21 O.N.G.C. Offshore Supply Vessel Project DT 22/02/1983 856 1108 0 0 1108 0 54 351 757 22 398
44 IDP-22 Calcutta Metro Railway DT 22/02/1983 857 4662 0 0 4662 0 228 1481 3181 92 1319
45 IDP-23 TNEB Micro Hydro Power Project DT 23/02/1983 858 1716 0 0 1716 0 85 546 1170 34 472
46 IDP-24 Bijapur Fertilizer Project DT 11/09/1984 880 7592 0 0 7592 0 370 1851 5741 196 2940
47 IDP-25 Ammonium Sulphate Project DT 11/09/1984 881 8734 0 0 8734 0 426 2130 6604 260 4112
48 IDP-27 VI Telecom. Project DT 11/09/1984 882 5176 0 0 5176 0 253 1263 3913 133 1956
49 IDP-28 Anola Fertilizer Project DT 26/12/1984 889 7690 0 0 7690 0 375 1688 6002 204 2913
50 IDP-29 VII Telecom. Project DT 26/12/1984 890 1658 0 0 1658 0 81 364 1294 44 500
51 IDP-30 Gas Pipeline Project DT 26/12/1984 891 20000 0 0 20000 0 976 4391 15609 531 8028
52 IDP-31 Eastern Gandak Canal Hydro Project DT 26/12/1984 892 1628 0 0 1628 0 79 357 1271 43 397
53 IDP-5 Telecom. Proj. DT 08/05/1980 764 2492 0 0 2492 0 122 1097 1395 41 1007
54 IDP-6 Bombay Offshore Oil Development Proj. DT 07/06/1980 785 8593 0 0 8593 0 419 3771 4822 141 3821
55 IDP-9 Chandrapur Thermal Power Proj. DT 02/06/1981 800 1415 0 0 1415 0 69 552 863 25 478
Sixth Five Year Plan (1980-85)-NON-PROJECT
56 IDP-7 Western Yamuna Canal Hydro Electric Project DT 19/03/1981 792 3244 0 0 3244 0 155 1379 1865 54 1235
57 IDP-8 Hazira Fertilizer Project DT 07/05/1981 799 9902 0 0 9902 0 483 3865 6037 192 4020
  TOTAL :   167776 0 0 167776 0 8182 51792 115984 3621 61514
Seventh Five Year Plan (1985-90)-PROJECT
58 ID-P43 Srisailam Left Bank Power Stn. Ph-I. DT 10/02/1988 984 26089 432 432 26089 0 1273 1910 24179 683 3043
59 ID-P44 Purulia Pumped Storage Project DT 10/02/1988 985 350 0 0 350 0 17 26 324 9 73
60 ID-P45 Anpara (B) Thermal Power Stn. Project-II DT 10/02/1988 986 13901 0 0 13901 0 678 1017 12884 368 2874
61 ID-P46 Assam Gas Power Stn. & Trans. Line DT 10/02/1988 987 12760 0 0 12760 0 622 933 11827 338 1707
62 ID-P47 T.Nadu Small Scale Ind. Dev. Project DT 10/02/1988 988 93 0 0 93 0 5 7 86 2 15
63 ID-P49 Telecom. Project (T) DT 10/02/1988 989 976 0 0 976 0 48 72 904 26 211
64 ID-P50 Gorakhpur Fert. Plant Revamping (FCI) DT 10/02/1988 990 0 0 0 0 0 0 0 0 0 0
65 ID-P51 FACT Captive Power Plant Project DT 10/02/1988 991 1346 0 0 1346 0 66 99 1247 36 323
66 IDP-32 Telecom. Project VIII DT 25/11/1985 90103 4670 0 0 4670 0 228 798 3872 131 1566
67 IDP-33 Sardar Sarovar Hydro Elect. Project DT 25/11/1985 902 2848 0 0 2848 0 139 487 2361 80 965
68 IDP-34 Ujjani Hydro Electric Project DT 25/11/1985 90102 1312 0 0 1312 0 64 224 1088 37 415
69 IDP-35 Anola Fertilizer Project (IFFCO) DT 25/11/1985 90105 9056 0 0 9056 0 442 1547 7509 255 3249
70 IDP-36 Gas Pipeline Project DT 25/11/1985 90101 15527 0 0 15527 0 757 2649 12878 437 6266
71 IDP-37 Gas Pipeline Project DT 18/12/1986 947010 17380 0 0 17380 0 848 2120 15260 517 6423
72 IDP-38 Gas Anola Fertilizer DT 18/12/1986 947020 1499 0 0 1499 0 73 183 1316 45 444
73 IDP-39 Telecom. Network DT 18/12/1986 947030 6846 0 0 6846 0 334 835 6011 204 2089
74 IDP-40 Teesta Canal HFP DT 18/12/1986 947040 8025 862 442 7605 420 391 978 6627 214 1467
75 IDP-41 Haldia Port Modernisation DT 18/12/1986 947050 1933 0 0 1933 0 94 235 1698 57 507
76 IDP-42 Assam Gas Turbine Project. DT 18/03/1987 951 30000 1024 589 29565 435 1463 3657 25908 1159 4928
77 IDP-48 Malakand Copper Extn. Project DT 12/01/1990 1990301 1200 0 0 1200 0 0 0 1200 32 234
78 IDP-52 Raichur Thermal Power Stn.Expansion Project DT 15/12/1988 1009 20028 0 0 20028 0 489 489 19539 501 2756
79 IDP-53 Ghatghar Pumped Storage Project DT 15/12/1988 1010 11414 11044 856 1226 10188 278 278 948 19 25
80 IDP-54 Tourism Infrastructure Dev. Project DT 15/12/1988 1011 6617 1086 1086 6617 0 225 225 6392 144 522
81 IDP-55 Small Scale Industries Dev. Programme DT 15/12/1988 1012 19500 0 0 19500 0 476 476 19024 488 4579
82 IDP-56 Uppar Kolab Irrigation Project DT 15/12/1988 1013 3114 413 413 3114 0 76 76 3038 71 359
83 IDP-57 Uppar Indravati Irrigation Project DT 15/12/1988 1014 3600 555 555 3600 0 91 91 3509 79 327
84 IDP-58 Ramgundam Fertilizer Plant Rehabilitation DT 15/12/1988 1015 0 0 0 0 0 0 0 0 0 0
85 IDP-59 Mysore Paper Mills Modernisation & Ren. Pj. DT 15/12/1988 1016 2381 712 516 2185 196 58 58 2127 42 62
86 IDP-60 Hoogly Dock & Port Modernisation DT 15/12/1988 1017 0 0 0 0 0 0 0 0 0 0
87 IDP-61 Modernisation of Burnpor Steel Plant IISCO DT 06/01/1989 1989301 5546 0 0 5546 0 135 135 5411 139 1343
88 IDP-62 Basin Bridge Gas Turbine-II,T.N.E.B. DT 27/03/1990 1990302 10779 0 0 10779 0 0 0 10779 402 1079
89 IDP-63 Gandhar Gas Based Combined Cycle Power Pj. DT 27/03/1990 1990303 12911 0 0 12911 0 0 0 12911 323 1925
90 IDP-64 Bhavani Kattalai Barrage Hydro Elec. Pj.-I DT 27/03/1990 1990304 0 0 0 0 0 0 0 0 0 0
91 IDP-68 Rolling Stock Workshop Modernisation Pj.-I DT 27/03/1990 1990305 0 0 0 0 0 0 0 0 0 0
92 IDP-69 Indira Gandhi Nahar Project (Engg.Services) DT 27/03/1990 1990307 50 0 0 50 0 0 0 50 1 7
93 IDP-70 Kolaghat Thermal Power Stn.Fly-Ash Utli.Pj. DT 27/03/1990 1990306 169 0 0 169 0 0 0 169 4 20
Seventh Five Year Plan (1985-90)-NON-PROJECT
94 IDC-5 Commodity Drought Relief DT 21/12/1987 979 29500 0 0 29500 0 1595 7176 22324 647 8426
  TOTAL :   281420 16128 4889 270181 11239 10965 26781 243400 7490 58229
Yearly Plan (1990-91)-PROJECT
95 ID-P66 Power System Improvement & Small H.P.(REC) DT 23/01/1991 1991307 24379 22304 3457 5532 18847 0 0 5532 57 112
96 IDP-71 Anpara Thermal Power Station-III DT 23/01/1991 1991306 49801 0 0 49801 0 0 0 49801 1245 9005
97 IDP-72 Teesta Canal H.E. DT 23/01/1991 1991305 6222 1115 524 5631 591 0 0 5631 130 508
98 IDP-73 Indira Gandhi Affoirsatation DT 23/01/1991 1991304 7869 5033 533 3369 4500 0 0 3369 73 250
99 IDP-74 Quality Control Healths DT 23/01/1991 1991303 569 40 40 569 0 569 569 0 16 33
100 IDP-75 Small Industry Development DT 23/01/1991 1991301 30000 0 0 30000 0 0 0 30000 750 5917
101 IDP-76 National Housing DT 23/01/1991 1991302 2970 0 0 2970 0 0 0 2970 74 582
  TOTAL :   121810 28492 4554 97872 23938 569 569 97303 2345 16407
Yearly Plan (1991-92)-PROJECT
102 IDP-65 Anpara Power Transmission System Pj.(I) DT 13/06/1991 1991312 17533 2234 2234 17533 0 0 0 17533 391 1006
103 IDP-67 Karnataka State Comprehensive Land Mng.Pj. DT 13/06/1991 1991313 0 0 0 0 0 0 0 0 0 0
104 IDP-77 Small Industry Development Pj.II DT 14/06/1991 1991314 20256 0 0 20256 0 0 0 20256 527 3897
105 IDP-78 Gandhar Gas Based Combined Cycle Power-II DT 09/01/1992 1992301 40191 0 0 40191 0 0 0 40191 1045 5162
106 IDP-79 Uran City Water Supply Project DT 09/01/1992 1992302 6788 3255 201 3734 3054 0 0 3734 92 263
107 IDP-80 Afforestation Project in Aravali Hills DT 09/01/1992 1992303 8095 2345 1142 6892 1203 0 0 6892 157 475
108 IDP-81 National Highway No.2 Improvement Project DT 09/01/1992 1992304 4855 3057 935 2733 2122 0 0 2733 51 84
109 IDP-82 Ajanta Ellora Conservation & Tourism Dev. DT 09/01/1992 1992305 3745 2120 503 2128 1617 0 0 2128 47 47
Yearly Plan (1991-92)-NON-PROJECT
110 IDC-6 Emergency Commodity Credit DT 31/05/1991 1991315 20256 0 0 20256 0 1095 1095 19161 519 3946
  TOTAL :   121719 13011 5015 113723 7996 1095 1095 112628 2829 14880
Eighth Five Year Plan(1992-97)-PROJECT
111 EXIM BANK-ESAL DT 22/09/1993 1993304 26500 0 0 26500 0 883 883 25617 953 4827
112 IDP-100 National Highway - 5 Improvement Project DT 28/02/1995 1995309 5836 5836 12 12 5824 0 0 12 0 0
113 IDP-101 National Highway-24 Improvement Proj. DT 28/02/1995 1995310 4827 4827 13 13 4814 0 0 13 0 0
114 IDP-102 Madras Sewerage Renovation & Imrpr.Proj. DT 28/02/1995 1995311 17098 16868 80 310 16788 0 0 310 8 11
115 IDP-103 Lake Bhopal Conservation Proj. DT 28/02/1995 1995312 7055 6437 541 1159 5896 0 0 1159 20 32
116 IDP-104 To improve Ecological state by Rajasthan DT 28/02/1995 1995313 4219 2563 878 2534 1685 0 0 2534 49 84
117 IDP-105 Industrial Pollution Control Project DT 28/02/1995 1995314 1525 1411 96 210 1315 0 0 210 4 5
118 IDP-108 Anpara Power Transmission - 12020.0 M DT 25/01/1996 1996302 12020 7902 1437 5555 6465 0 0 5555 105 148
119 IDP-109 Bangalore Water Supply Proj.- 28452 M DT 25/01/1996 1996303 28452 28212 668 908 27544 0 0 908 6 8
120 IDP-111 Attapady Water Land Deve. 5112 M DT 25/01/1996 1996305 5112 5090 7 29 5083 0 0 29 0 0
121 IDP-112 Gujarat Afforestation & Dev. 15760 M DT 25/01/1996 1996306 15760 11144 3216 7832 7928 0 0 7832 107 153
122 IDP-113 Kurnool Cuddapha Canal Mod. Proj.16049 M DT 25/01/1996 1996307 16049 16049 104 104 15945 0 0 104 1 1
123 IDP-115 Pipavav Port Ship Breaking Proj 7046 M DT 25/01/1996 1996301 7046 4993 2425 4478 2568 0 0 4478 61 84
124 IDP-117 Power Sector DT 25/02/1997 1997301 11087 11024 77 140 10947 0 0 140 2 2
125 IDP-118 Power Sector DT 25/02/1997 1997302 1700 1700 0 0 1700 0 0 0 0 0
126 IDP-121 Railway System NCT DT 25/02/1997 1997303 14760 14760 248 248 14512 0 0 248 0 0
127 IDP-122 Calcutta Transport Infrastructure Dev. DT 25/02/1997 1997304 10679 10334 82 427 10252 0 0 427 8 10
128 IDP-123 Kerala Water Supply Project DT 25/02/1997 1997305 11997 11997 0 0 11997 0 0 0 0 0
129 IDP-124 Eastern Karnataka Afforestation DT 25/02/1997 1997306 15968 15069 2273 3172 12796 0 0 3172 29 31
130 IDP-125 T.N. Afforestation Project DT 25/02/1997 1997307 13324 12252 1643 2715 10609 0 0 2715 28 30
131 IDP-126 Rajghat Canal Irrigation Project DT 25/02/1997 1997308 13222 13222 600 600 12622 0 0 600 4 4
132 IDP-83 Anpara'B' Thermal Power Station Project. DT 03/12/1992 1992312 13200 0 0 13200 0 0 0 13200 343 1764
133 IDP-84 Yamuna Action Plan Project. DT 21/12/1992 1992314 17773 13867 1191 5097 12676 0 0 5097 104 160
134 IDP-85 Srisailam Power Transmission System. DT 21/12/1992 1992315 3806 3299 1346 1853 1953 0 0 1853 20 104
135 IDP-86 Ghandhar Gas Base Combine Cycle Power Proj. DT 21/12/1992 1992316 14705 34 34 14705 0 0 0 14705 380 1331
136 IDP-87 Udyog Mandal Ammonia Plant Replacement Proj DT 21/12/1992 1992317 24482 12417 1032 13097 11385 0 0 13097 316 713
137 IDP-88 Anpara B Thermal Power Project DT 24/01/1994 1994301 17638 6746 1207 12099 5539 0 0 12099 296 773
138 IDP-89 Bakreshwar Thermal Power Project DT 24/01/1994 1994302 26982 9908 9908 26982 0 0 0 26982 541 724
139 IDP-90 Faridabad Gas Based Power DT 24/01/1994 1994303 23536 20545 2661 5652 17884 0 0 5652 67 67
140 IDP-91 Bridge Over Yamuna River at Naini DT 24/01/1994 1994304 10037 9918 40 159 9878 0 0 159 3 5
141 IDP-92 NH 5 Improvement DT 24/01/1994 1994305 11360 11360 11 11 11349 0 0 11 0 0
142 IDP-93 SSI Development Prog. IV DT 24/01/1994 1994306 30000 0 0 30000 0 0 0 30000 781 3740
143 IDP-94 Generation of Power from Srisailam Left Ban DT 28/02/1995 1995303 22567 6382 2634 18819 3748 0 0 18819 451 1087
144 IDP-95 Srisailam Power Transmission System Proj(II DT 28/02/1995 1995304 9546 9208 2012 2350 7196 0 0 2350 23 24
145 IDP-96 Assaam Gas Tuurbine Power Stn.Proj (III) DT 28/02/1995 1995305 15821 8136 1198 8883 6938 0 0 8883 216 501
146 IDP-97 Bakreswar Thermal Power Stn Unit 3 Proj DT 28/02/1995 1995306 8659 6264 5283 7678 981 0 0 7678 88 109
147 IDP-98 Purulia Pumped Storage Proj.at W.Bengal DT 28/02/1995 1995307 20520 19621 384 1283 19237 0 0 1283 24 41
148 IDP-99 Kothagudem 'A' Thermal Power Stn. Reh.Proj. DT 28/02/1995 1995308 5092 1901 415 3606 1486 0 0 3606 86 165
Eighth Five Year Plan(1992-97)-NON-PROJECT
149 IDC-7 Hydrocarbon Sector DT 03/12/1992 1992313 33085 0 0 33085 0 0 0 33085 860 3822
  TOTAL :   553045 341296 43756 255505 297540 883 883 254622 5984 20560
Yearly Plan (1997-98)-PROJECT
150 IDP-127 Simhadri and Vizag Trans DT 12/12/1997 1997313 10629 10629 0 0 10629 0 0 0 0 0
151 IDP-128 Srisailam Left Bank Power Station DT 12/12/1997 1997314 14499 13810 1353 2042 12457 0 0 2042 15 15
152 IDP-130 Bakreswar Thermal Power Station DT 12/12/1997 1997315 34151 34147 11127 11131 23020 0 0 11131 43 43
153 IDP-132 Punjab Afforestation Programme DT 12/12/1997 1997316 6193 6130 567 630 5563 0 0 630 2 2
154 IDP-133 Madhya Pradesh Sericulture Programme DT 12/12/1997 1997317 2212 2212 51 51 2161 0 0 51 0 0
155 IDP-134 Manipur Sericulture Project DT 12/12/1997 1997318 3962 3962 208 208 3754 0 0 208 0 0
156 IDP-135 Rengali Irrigation Project DT 12/12/1997 1997319 7760 7618 664 806 6954 0 0 806 6 6
  TOTAL :   79406 78508 13970 14868 64538 0 0 14868 66 66
Ninth Five Year Plan (1998-2003)-
157 IDP-137 Bakreshwar Thermal Power Station Unit-3 DT 24/03/1999 1999301 11537 0 0 0 11537 0 0 0 0 0
  TOTAL :   11537 0 0 0 11537 0 0 0 0 0
  COUNTRY TOTAL :   1671474 477435 72184 1254686 416788 30299 374455 880231 23853 392956